C R Francis / Architecture
Copyright©: C. R. Francis / Architecture, p.a. 2017
New Bern, NC
Additions & Renovations:
St. Paul Catholic Church
Structural System:
Braced steel frame on Spread Footings.
Mechanical System:
4 pipe chilled and heated water system connected to chiller and boilers.
Contractor:
Farrior & Sons Farmville, NC
Cost:
$4,385,592 [2004]
Area:
New: 13,427 sf
Renovated: 12,171 sf
26,597 sf
Consultants
Structural: Dixon Associates Raleigh, NC
Plumbing, Mechanical, & Electrical: Engineering Source of NC Greenville, NC
Designed by Charles Francis and Diane Filipowicz
under the predecessor firm: Stephens & Francis and
completed by C.R. Francis / Architecture