New Bern High School
New Bern, NC
needs are divided among the following
categories: faculty parking, administrative
parking, student parking, bus parking, and
service and maintenance access.
Structure
Within, the facility is divided into three areas -
the Administrative Area, the Academic core,
and the Vocational Facility. Primary points of
entry occur in each area. The Administrative
Area consists of offices for the principal,
secretaries, guidance counselors, the faculty
lounge, and a small theatre space and projects
out toward the highway providing an area of
quiet within this massive facility. The
Administrative Area connects to the Academic
Core by a wide corridor which opens into the
large Dining/Commons space. Running the
length of the Academic Core, a two-story
"spine" was formed, consisting of gymnasium,
dining/commons, library and courtyard. Two
stories of classrooms were developed around
the spine. This concept allows natural light from
and views to the outside for the classes and
allows interior vistas from the corridors.
Separated from the main Academic /
Administrative Facility, the Vocational Facility
provides shop space for studies in automotive
repair, electronics, graphics, carpentry, and
masonry.
The facility opened for the 1990-1991 school
season at a cost of $58.86/sf.
Consultants
Structural: GKC Associates Durham, NC
Plumbing, Mechanical, & Electrical: Buffalo Morgan & Associates, Inc. Raleigh, NC
Area:
New: 237,000 sf
Contractor:
Hudson Construction Co. Greenville, NC
Cost:
$~14,000,000 [1988]
Structural System:
Moment resistant steel frame on Pilings with Piling Supported First Floor.
Mechanical System:
Water source heat pumps connected to a heat transfer closed water loop with supplemental
cooling tower and boilers.